For homeowners
Your panel is the bottleneck when you add an EV charger, solar, or a heat pump. We size the service so everything runs at once.
- Breakers trip when AC runs
- Adding a 48 amp EV charger
- Planning solar and battery
A 200 to 400 amp service upgrade Upland CA gives your home the amperage modern appliances, EV chargers, and solar arrays demand. We handle the load calculation, permit, meter main, and panel swap for houses in San Bernardino County that keep tripping breakers or planning a big electrical addition. If your 100 or 200 amp panel is maxed out, this is the fix.
Load calculationPermit filedPanel labeledEvery 200 to 400 amp service upgrade includes the load calculation, permit, panel, meter main, and testing. Here is what we cover and what we price separately if your service needs it.

We measure your existing demand with a clamp meter and multimeter, size the new service to NEC 2020/2023, and file the city electrical permit. You get a written scope and a fixed price before we start.
We install a 400 amp panel from Square D, Eaton, or Siemens with a 400 amp main breaker. The bus bar is rated for the full load, and we leave spare spaces for an EV charger, solar backfeed, or future circuits.
We replace the meter main and service mast when they are damaged or undersized. We coordinate the Southern California Edison disconnect and reconnect so the new meter base passes utility inspection.
We install AFCI and GFCI breakers where California Electrical Code requires them and add a whole-home surge protective device at the panel. Every circuit is labeled and tested before we call for inspection.
We verify voltage, amperage, and grounding with a voltage tester and circuit breaker finder, then meet the city inspector on site. You get the permit sign-off and a walkthrough of the new panel.
The approach is the same for a home and a business. What changes is the access, the schedule and who needs the paperwork.
Your panel is the bottleneck when you add an EV charger, solar, or a heat pump. We size the service so everything runs at once.
Multi-unit buildings and shared meter mains need capacity for each tenant. We size the service and install subpanels to match.
A plain-language look at what 200 to 400 Amp Service Upgrade involves and when it is needed.
See how it worksA 200 to 400 amp service upgrade Upland CA replaces your existing service panel, meter main, and often the service mast with higher-capacity equipment rated for 400 amps. We pull a city electrical permit, coordinate with Southern California Edison for the meter disconnect, and install a new panel with a 400 amp main breaker, copper or aluminum feeders sized to NEC 2020/2023, and branch circuits protected by AFCI and GFCI breakers where code requires. Most jobs take one to three days on site.
Upland homes built in the 1960s through 1980s often have 100 amp service that cannot keep up with a heat pump, EV charger, and electric range running at once. If your breakers trip when the dryer and microwave run together, or you are adding a 48 amp EV charger and rooftop solar, a heavy duty electrical service upgrade Upland CA is the right call. We see this constantly in The Colonies and Historic Downtown Upland, where older service masts and Zinsco or Federal Pacific panels are still in service.
A 400 amp service gives your home the capacity to run everything at once.

We handle the load calculation, permit, utility coordination, and installation. You get a clear schedule and a panel that passes inspection.
We start with a full electrical load calculation using a clamp meter and multimeter to measure your existing demand. We check the service mast, meter main, and branch circuits, then size the new 400 amp service to NEC 2020/2023. You get a written scope and a fixed price before we pull the permit.
We file the city electrical permit with Upland and schedule the meter disconnect with Southern California Edison. This usually takes three to seven business days. You do not have to call the utility or stand in line at the building department. We handle the paperwork and keep you posted on the schedule.
On install day we disconnect the old service, remove the Zinsco or Federal Pacific panel, and mount the new 400 amp panel, meter main, and service mast. We pull new copper feeders, torque every lug with a torque screwdriver, and label each breaker. Most swaps take six to ten hours.
We reconnect branch circuits, install AFCI and GFCI breakers where required, and add a whole-home surge protective device. Every circuit gets tested with a voltage tester and circuit breaker finder. We verify voltage, amperage, and grounding before we call for inspection.
The city inspector signs off, then we walk you through the new panel. We show you which breakers control which rooms, how to reset the main, and where the surge protector sits. You get the permit sign-off and a labeled panel before we leave.
Move across a circle, or focus it and press Enter, for an illustrative thermal view of the photograph.

We measure existing demand and verify voltage and amperage on the new service before we call for inspection.

We torque every lug and breaker terminal to the manufacturer's spec, which prevents loose connections and overheating.

We map every branch circuit and confirm power is off before we work, then label each breaker correctly.

We pull new copper feeders through conduit and bend conduit for the service mast and meter main runs.

We work safely around live equipment and cut heavy feeders cleanly for a proper termination.
Thermal views are illustrative, generated from the photographs.
We install these brands because they have available 400 amp main breakers and reliable AFCI and GFCI options.
We calculate the existing and planned load per NEC 2020/2023 before sizing the service. This tells us whether 200 amps is enough or you need a 400 amp panel for EV, solar, and all-electric appliances.
We follow California Electrical Code for AFCI and GFCI protection, grounding, and Title 24 energy standards. Every panel we install meets the code the Upland inspector checks.
We schedule the meter disconnect and reconnect with Southern California Edison, so the power is off only for the time we need to swap the meter main and panel.
We use a torque screwdriver on every lug and breaker terminal. Loose terminations are a common cause of panel failure, and torquing to spec prevents callbacks.
We label every breaker and provide the load calculation and permit paperwork. You get a panel that is easy to service and a record of the upgrade for insurance or resale.

A homeowner in The Colonies adds a 48 amp EV charger and a 10 kW solar array to a house with 100 amp service.
We run a load calculation, pull the Upland permit, and install a 400 amp panel with a dedicated EV circuit and a solar backfeed breaker. We coordinate the Edison disconnect and install a whole-home surge protector.
Outcome: The homeowner charges the EV overnight and runs the house on solar during the day without tripping the main.

A 1960s ranch in Historic Downtown Upland still has a Federal Pacific panel and aluminum wiring.
We replace the Federal Pacific panel with a 400 amp Square D service, install AFCI and GFCI breakers, and repair the aluminum wiring connections. We file the permit and meet the inspector.
Outcome: The house passes inspection, the insurance red flag is cleared, and the panel is labeled for future work.

A property manager in North Upland needs more capacity for a fourplex with electric ranges and heat pumps.
We size a 400 amp service for the building, replace the meter main and service mast, and install subpanels for each unit. We schedule the work around tenants and keep the power off for only a few hours.
Outcome: All four units have dedicated capacity, the building passes inspection, and the tenants keep their power.

A homeowner in San Antonio Heights plans an ADU and a pool, but the existing 200 amp panel has no spare spaces.
We upgrade to a 400 amp service, add a subpanel for the ADU and pool equipment, and install GFCI breakers for the pool circuits. We run the load calculation to size the feeders.
Outcome: The ADU and pool have dedicated circuits, and the main panel still has room for future additions.

A homeowner in Upland Hills wants battery backup and a heat pump but the 200 amp service is maxed out.
We install a 400 amp panel with a critical-load subpanel for the battery backup, dedicated circuits for the heat pump, and a surge protective device. We handle the permit and utility coordination.
Outcome: The heat pump and battery backup run without derating, and the homeowner has capacity for future electrification.

Upland's housing stock ranges from 1920s bungalows near Historic Downtown to 1980s tract homes in The Colonies and larger properties in San Antonio Heights. Many of these homes still have 100 amp service, aluminum wiring, or a Federal Pacific or Zinsco panel that cannot pass inspection.
The city requires an electrical permit for any service upgrade, and Southern California Edison requires a disconnect and reconnect for the meter. We handle both. Summer heat pushes demand higher, and more homeowners are adding EV chargers, solar, and heat pumps, which is why we see so many requests for a 400 amp electrical service near me Upland.
If you are planning a 400 amp service upgrade for large home Upland, California projects, we size the feeders and bus bar for the full load, not just today's appliances.

Before: A 1970s home in The Colonies had a 100 amp panel with no spare spaces. The owner added a 48 amp EV charger and the main tripped every time the AC and charger ran together. The panel was a Federal Pacific with known failure modes.
After: We installed a 400 amp Square D panel with a new meter main, a dedicated 48 amp EV circuit, and AFCI and GFCI breakers. The home now runs the AC, EV charger, and dryer at the same time without tripping. The inspection passed the first time.
We recommend an annual panel check and keeping the area around the panel clear. Test the AFCI and GFCI breakers monthly using the test button.
Before: A 1920s bungalow near Historic Downtown Upland still had a fuse box and aluminum wiring. The insurance company flagged the panel and required replacement. The service mast was damaged and failed utility inspection.
After: We replaced the fuse box with a 400 amp breaker panel, repaired the aluminum wiring connections, and installed a new service mast and meter main. The home passed inspection and the insurance policy was renewed.
Keep the panel labeled and have the aluminum connections checked every few years. We provide the permit paperwork for your records.
Before: A homeowner in San Antonio Heights wanted a 10 kW solar array and battery backup but the 200 amp panel had no capacity for the backfeed. The load calculation showed the service was already near its limit with the pool pump and heat pump.
After: We upgraded to a 400 amp service with a dedicated solar backfeed breaker and a critical-load subpanel for the battery. The solar array and battery backup now run without derating, and the pool and heat pump have dedicated circuits.
Monitor the solar production and battery status through the app. We recommend a panel inspection every two years as the system ages.
An undersized or failed panel causes tripped breakers, failed inspections, and insurance problems. Here is what we fix.
More capacity means no tripped breakers and room for EV, solar, and heat pumps.
A 400 amp panel supports a 48 amp Level 2 EV charger plus a 10 kW solar array and battery backup without derating. You can charge overnight and run the house on solar during peak hours. We size the bus bar and feeders so you are not maxed out the day the system goes live.
If your 100 amp panel trips when the AC, dryer, and microwave run together, the service is undersized. A 400 amp upgrade Upland, California eliminates that bottleneck. You get a dedicated 240V circuit for the EV, a 50 amp range circuit, and spare breaker spaces for future additions.
Federal Pacific and Zinsco panels have known failure modes and can void homeowner insurance. Replacing them with a Square D or Eaton 400 amp panel brings the service up to California Electrical Code and clears the red flag. We install AFCI and GFCI breakers, surge protective devices, and label every circuit.
A 400 amp service is a selling point in Upland's market. Buyers with EVs or plans for a pool house or ADU see a panel that already has capacity. We provide the load calculation and permit paperwork so the upgrade is documented when you list the home.
What a written scope covers and what shapes it. Prices are set by the business after the first look.
Included
Depends on
Clear records you can keep and share.
Written demand calculation
Labeled breaker schedule
City sign-off paperwork
Before and after panel photos
The right size depends on your calculated load and what you plan to add.
Enough for most homes without EV or solar
Capacity for EV, solar, and all-electric appliances
Dedicated panel for ADU, pool, or garage
A list like this tells people straight away whether you cover their street. Not listed? Call and ask: it only takes a minute.
Based in Upland and covering the places around it. Pick one for local details.
You need one when your existing 100 or 200 amp panel cannot carry the load. Signs include breakers tripping when the AC, dryer, and microwave run together, a Federal Pacific or Zinsco panel, or plans to add a 48 amp EV charger, solar, a heat pump, or an ADU. A load calculation confirms it. If your calculated demand exceeds 200 amps, we size the service to 400.
A 400 amp service upgrade for large home Upland, California projects with long runs or a new mast lands at the higher end. You get a fixed price after the load calculation.
Yes. A 400 amp panel gives you enough capacity for a 48 amp Level 2 EV charger, a 10 kW solar array, and battery backup without derating the main. We size the bus bar and feeders so the solar backfeed breaker and EV circuit have dedicated spaces. We also install a whole-home surge protective device to protect the electronics.
Yes. The city of Upland requires an electrical permit for any service upgrade, and Southern California Edison requires a disconnect and reconnect for the meter. We file the permit, schedule the utility, and meet the inspector on site. The permit also documents the upgrade for insurance and resale, which matters when you sell the house.
Other services from the same team.
Call (909) 850-3163 for a load calculation and fixed price on your 400 amp service upgrade. We pull the permit, coordinate Southern California Edison, and install the panel. Most Upland jobs are scheduled within a week.
Call or email with your address and what the panel is doing, and we will tell you what the job likely involves. We answer calls Monday through Friday, 8am to 6pm, and return messages from Upland, Rancho Cucamonga, and Ontario the same business day. For dead panels and burning smells, say so on the call.